| TAHUN | PROJECT NAME/ DESKRIPSI | OWNER | DURASI |
| 2026 | PEMASANGAN PIPA CA PT.OTS INTERNASIONAL | PT.PGN (PMO) | 12 MONTH |
| 2025 | PEMASANGAN PIPA CA PT.ELECMETAL LONGTENG INDONESIA | PT.PGN (PMO) | 6 MONTH |
| 2025 | pemasangan pipa Rumah Tangga (JARGAS) | ESDM | 24 MONTH |
| 2025 | PEMASANGAN PIPA CA PT.BUMI LAUTAN KOPI | PT.PGN (PMO) | 3 MONTH |
| 2025 | PEKERJAAN RE-ROUTE PIPA GAS 12 INCH BLOK I | PT.BKMS | 3 MONTH |
| 2025 | PEMASANGAN PIPA PELANGGAN KECIL PK 1 -2025 | PT.PGN (PMO) | 4 MONTH |
| 2025 | PEKERJAAN ADDITIONAL BACK UP STREAM GAS CUSTOM METERING SYSTEM | TIS PETROLEUM E&P Blora PTE. LTD | 2 MONTH |
| 2024 | PEMASANGAN JARINGAN PIPA 8 INCHI PT.LESTARI NASIONAL GAS | PT.LESTARI NASIONAL GAS (LNG) | 12 MONTH |
| 2024 | PAKET PEKERJAAN DESIGN & BUILT PIPA GAS MENUJU PTFI & XYG | PT.BKMS | 24 MONTH |
| 2024 | PENGADAAN DAN PEMASANGAN PIPA GAS JIIPE MANYAR-GRESIK | PT.INTI ALASINDO ENERGY | 10 MONTH |
| 2024 | OSBL Mechanical & Piping PT. Khatulistiwa Raya Cakrawala | PT. Khatulistiwa Raya Cakrawala | 15 MONTH |
| 2023 | RELOKASI BAK KONTROL DI AREA GRESIK JAWA TIMUR MENGGUNAKAN METODE PENGUATAN | PT.SADIKUN NIAGAMAS RAYA | 2 MONTH |
| 2023 | REHABILITASI PIPA BAJA DN.1000 – UINSA | PT.PDAM SURYA SEMBADA | 8 MONTH |
| 2023 | PEKERJAAN MODIFIKASI MRS G650 MENJADI CUSTODY METER | PT.BKMS | 2 MONTH |
| 2022 | PEMASANGAN PIPA PENYALUR GAS KE KAWASAN INDUSTRI JIIPE GRESIK (TAHAP 1 DAN 2) | PT.BAYU BUANA ENERGI | 24 MONTH |